Short Gap Crossing
Enables Gap Crossing over ditches and small obstacles.
 

 

  Products
 
    Mineplough
 
    Surface Clearance Device
 
    Light Weight Mine Roller
 
    Magnetic Signature Duplicator
 
    Marker
 
    Remote Control
 
    Dozer Blade
 
  Technical Overview  

 Technical Summary

    Obstacle Clearance Blade
 
 
The short gap crossing system enables tracked and wheeled combat and support vehicles to lay Pipe Fascines, in order to cross wet and dry gaps rapidly without the need for bridging.

Overview
The Short Gap Crossing System consists of a stowage, launching and recovery capability for Pipe Fascines. Systems are available for heavy, medium and light vehicles.

The Pipe Fascine is a bundle of lightweight plastic pipes chained together to allow the bundle to alter its shape to the profile of the gap. Pipe Fascines do not create dams in wet gaps and can be recovered and reused many times.

They can be used in natural gaps, bomb craters, anti-tank ditches and to replace destroyed bridges.

A single Maxi Pipe Fascine, can fill a gap 5.00m (16’5”) wide for tracked vehicles. More can be added for wider gaps.

Mini Pipe Fascines are available for light armoured vehicles.
  Maxi Pipe Fascine

Weight
2,500kg (5,510lb)


    Earth Anchor
 
        PEROCC
 
        Excavator Arm
 
    Width
4.60m (15’)

    Short Gap Crossing
 
        Crowd Control
 
    Approximate Diameter
2.20m (7’3”)

    Vehicle Integration
 
        Logistics
 
    NATO Stock Number
NM/5680-99-772-1832

    Demining
 
           
    Mini Pipe Fascine        
    Weight
210kg (463lb)
 

       
    Width
4.60m (15’)

       
    Approximate Diameter
0.55m (22”)

       
    NATO Stock Number
NM/5680-99-772-1833